HONGYANG GROUP Australia Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Australia Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U403 Emergency shut-valve

fuel-dispenser

U403 Emergency shut-valve

U403 Series Emergency Shut-off Valve are installed on fuel supply lines beneath at grade level to minimize hazards associated with collision or fire at the dispenser. If the dispenser is pulled over or dislodged by collision, the top of the valve breaks off the flow of fuel. Single-poppet models shut off supply flow, while double-poppet models shut off supply as well as prevent release of fuel from the dispenser's internal piping. The base of the Emergency Valve is securely anchored to the concrete dispenser island through a stabilizer bar system within a U-Bolt Assembly. Valve inlet (bottom) connection are female pipe threads and outlet (top) connections are available with female threads, male threads, or a union fitting. Other options include suction system models with a normally closed secondary poppet which maintain prime, and models with external threads on inlet body which connect to secondary containment system.

Materials:

Body: cast iron(Spray-paint)

Surface: electronic Nickel plated

Seal : Buna-N O-ring

Features :

Flow rate: 0- 120 L/M

Working pressure: 0.2Mpa

Valve closing speed: 0.5s

Lowest shut-off temperature: 75 â„?

Medium: water, gasoline, diesel, and kerosene

Operating Environment: -30 ~+55degree

Fire Protection- a fusible link trips the valve closed at 75 to shut off fuel

supply to the dispense.

Integral Test Port - a 3/8" Test Port allows the piping system to be air tested

without breaking any piping connection.

Low-Profile Tops- Female and Union-top double-poppet valves have a low-profile top to allow upgrading from single-poppet valves without changing existing piping.

100% Factory Tested.

Replacement Parts:

Key Description Weight

1 Protect pin

1 Cap(Single) 0.795kg

2 Cap(Double) 0.895kg

Package:

Net Weight Cross Weight Dimension

18kg/case of 6 20kg/case of 6 37.5x13.5x39 cm /case of 6

products links

links

technical archives

    g proof of filling station including awning mostly adopt lightningproof belt based on lightning condition of building and construction. It would be more economical. Metal pipe and line that connected indoors possibly generate spark and ignite vapor in some intervals of them as being attacked by direct lightning and lightning inductio fuel dispenser n, resulting in explosion or fire. Thereby, this item of regulations is necessary. According to testing the burring length exceeding 50m at outdoors or 100m indoors or at least two grounding points with no more than 20 in lead pipe will largely reduce high electric potential indoors. Article II Wiring system The power load degree in filling station is Class III. Power supply adopts 380V/220V in station. Mini internal-combustion g fuel dispenser enerator is adopted as power supply. Its exhaust pipe mounts exhausting fire-resistance device. Horizontal distance from exhaust pipe to each explosion area should comply with the stipulation: if exhaust outlet under 4.5m ground the distance no less than 5m; if high than 4.5m, the distance no less than 3m. Electric line in filling station should adopt cable and burry, using steel pipe as line through vehicle road. If there are many lines a cable tunnel is suggested to use, filling with sand, exclusive other pipes. Article III Earth wire and grounding system The steel tank used for storing Class A oil shoul fuel dispenser d mount static-proof grounding device. The lightning conductor similarly used for this function. The starting and end point of delivery pipeline in tunnel or at ground should set static-proof and lightning induction device, grounding resistance no more than 30Ω. The vehicle tank discharge area in filling station should set static-proof grounding device, resistance no more than 100Ω. The design of static—proof grounding in forecourt should comply with the relevant stipulation of current national standard The Design and construction of forecourt. Article IV Vapor-Recovery system Along with the number of vehicle and filling stati

technical specification

    s   3 bin8 R(1-9) M   (03H) (1-8) W(1-2)   Number of washing modes defined (Default =1).   0 = not configured   n = numbe fuel dispenser r of washing modes   Please note that CW s that do not permit the   NumberOfWashingModes to be changed remotely should:   - Reject any write attempts with a Data_ACK value of 2   (Read OnlyNot Writable).   - Must set the NumberOfWashingModes to the value of   washing modes that is hard coded in their program.   When a maste fuel dispenser r resetcold start occurs on the CW it must   reset this DataID to its default value.  Version 1.33 IFSF - STANDARD FORECOURT PROTOCOL September 2005   CAR WASH SPECIFICATION   Page: 28 of 65   NumberOfCWPs   5 bin8 R(1-9) M   (05H) (1-15) W(1-2)   Number of car washing points controlled by the CWC   (defau fuel dispenser lt=1).   0 = not configured   n = number of car washing points   Please note that CW s that do not permit the   NumberOfCWPs to be changed remotely should:   - Reject any write attempts with a Data_ACK value of 2   (Read OnlyNot Writable).   - Must set the NumberOfCWPs to the value of washing   points that is hard coded in their program.   When a master resetcold start occurs on the CW it must   reset this DataID to its default value.  

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    ogy services just as it commoditised hardware. The initiative got a boost on November 14th when Dell took the rare step of acquiring a company it bought ACS, a British technology-services firm with a strong presence in London s financial district. Dell s plan is to move up from basic things like PC support to more sophisticated s fuel dispenser ervices such as designing and installing big computer systems. As with other markets it has attacked from below, such as servers and storage, Dell plans to undercut the incumbents with lower prices and thinner margins. Dell s services business already brings in around $5 billion a year, roughly 10% of its sales, and the margins are far higher than on hardware. Its hardware business is growing at around 5% a year, but its services fuel dispenser division is growing by more than 20%. Dell s European services group has doubled both revenues and customers this year, says Paul Bell, the firm s boss in the region. Yet moving farther into services could put Dell in competition with its own customers, since many services firms buy Dell gear on behalf of their clients. Worse, Dell s move comes just as the services business is looking tougher than ever, due to the rise of Indian firms. © 2006 . About sponsorship Face value The executioner Nov 30th 2006 From The Economist p fuel dispenser rint edition Volkswagen s Ferdinand Piëch is fanatical about cars and ruthless towards people AP ACCORDING to rumour, Ferdinand Piëch likes to run chickens off the road in his Volkswagen Touareg. Whether that is true or not, he certainly tends to ride roughshod over humans, metaphorically at least. During his long career as head of Audi, chief executive of Volkswagen and now VW s supervisory-board chairman, he is reckoned to have fired at least 30 directors. They include three of his successors as head of Audi, a Volkswagen subsidiary, and his